Tesla Secures Full Output of New 140 MW Texas Solar Project

Aerial view of a vast solar panel array at sunset in Texas

Quick Read

  • Tesla signed a PPA for the entire 140 MW output of the new Lumen solar farm in Texas.
  • The project is located in Anderson County, within the ERCOT market.
  • Construction is set to begin in 2027, with the facility becoming operational by 2029.
  • This deal expands a previous 2024 collaboration between Tesla and Zelestra in Spain.

Tesla has entered into a long-term Power Purchase Agreement (PPA) with the Madrid-based renewable energy firm Zelestra to acquire the entire electricity output of a forthcoming 140 MW solar energy project in Texas. The facility, dubbed the Lumen solar farm, will be situated in Anderson County within the Electric Reliability Council of Texas (ERCOT) market.

According to the official announcement from Zelestra on July 29, 2026, construction on the site is slated to commence in 2027. The company expects the plant to reach full operational capacity by 2029. This agreement represents a significant expansion of the partnership between the two firms; they previously collaborated in 2024 on a 57 MW PPA involving solar installations in Spain’s Castilla-La Mancha region.

Phil North, CEO of Zelestra US, stated that the project is intended to support Tesla’s rapidly increasing energy requirements in the Texas region. The deal underscores Tesla’s ongoing strategy to secure direct, large-scale renewable energy supply to power its manufacturing and operational infrastructure.

|
Creator:Azat TV Editorial

LATEST NEWS